Search


Current filters:

Start a new search
Add filters:

Use filters to refine the search results.


Results 1-10 of 10 (Search time: 0.038 seconds).
  • previous
  • 1
  • next
Item hits:
PreviewIssue DateTitleOther titleAuthor(s)
Howard East borefield stage 2 water rising main.pdf.jpg-Darwin - Howard Springs, Howard East borefield Stage 2. Water rising mainGeotechnical site investigation report - Howard East borefield Stage 2-
Darwin City waterfront development water main.pdf.jpg-Darwin City Waterfront development water main - geotechnical investigationGeotechnical investigation Darwin City WaterfrontGray, Murray; RMG Geotechnical Consultants
Cox Peninsula Road, Darwin CH 47km to 67km subgrade and terrain investigation.pdf.jpg-Cox Peninsula Road, Darwin CH: 47 km to 67 km subgrade and terrain investigationSubgrade and terrain investigation Cos Peninsula Road, DarwinHo, G
Hydrogeological investigation of deep groundwater resources in the Ti-Tree Basin, Northern Territory.pdf.jpg-Hydrogeological investigation of deep groundwater resources in the Ti-Tree Basin, Northern TerritoryDeep groundwater resources of the Ti-Tree BasinWischusen, J. D. H.; Bastrakov, E. N.; Magee, J. W.; Lewis, S. J.; Gow, L. J.; Kilgour, P. L.; Bell, J. G.; Kelly, T.
Batchelor Road Ch 8.4km to Ch 10.9km geotechnical investigation.pdf.jpg-Batchelor Road CH 8.4 km to CH 10.9 km geotechnical investigation-Ullman & Nolan (NT) Pty Ltd
Litchfield Park Road Ch 14 - 44 km Phase 1 gravel search - prospecting.pdf.jpg-Report of investigation on Litchfield Park Road CH: 14 - 44 km Phase 1 gravel search - prospecting-Campbell Project Managers Pty Ltd
Casuarina Police Station geotechnical site investigation.pdf.jpg-Casuarina Police Station. Geotechnical site investigationGeotechnical site investigation Casuarina Police StationWorleyParsons Services Pty Ltd
Arnhem Highway Ch 100.4km to 105.8km geotechnical investigation.pdf.jpg-Arnhem Highway CH 100.4 km to CH 105.8 km geotechnical investigationGeotechnical investigation Arnhem HighwayUllman & Nolan (NT) Pty Ltd
East Arm Port, Darwin. Proposed ship loader.pdf.jpg-East Arm Port, Darwin proposed ship loader. Preliminary geotechnical assessmentPreliminary geotechnical assessment East Arm Port proposed shiploaderDouglas Partners Pty Ltd
Proposed Police Fire and Emergency and St. Johns facility Humpty Doo.pdf.jpg-Proposed Police, Fire, Emergency and St. Johns facility Humpty DooGeotechnical investigation Cnr. Arnhem Highway and Spencely Road, Humpty DooDouglas Partners Pty Ltd