Please use this identifier to cite or link to this item: http://hdl.handle.net/10070/267323
Note: the high definition versions of some images are not available online, but may be Ordered
Title: Report of investigation on Finke Road gravel search CH: 0-150km. Part 2 110-150 km
Alternative Title: Finke Road gravel search Part 2
Author: Campbell Project Managers Pty Ltd
Alternative Title: Finke Road gravel search Part 2
Publication location: Palmerston (N. T.)
Publisher: Northern Territory. Department of Infrastructure, Planning and Environment
Description / Abstract: The purpose of this investigation was to evaluate potential gravel pits for road base materials to be used on the Finke Road between Chainage 110 and 150 km. Part 1 of report TR 56 / 04 evaluated 13 areas between 0 and 110 km. Only 4 of these areas were considered suitable for road building materials (5.70, 6.20, 37.70 and 70.96 km). This report is part 2 to Technical Report TR 56 / 04 and evaluated three existing pit areas at chainages 122.5 km (area N), 129.4 km (area L) and146.8 km (area K).
Physical Description: 83 pages : colour illustrations, maps, plans, tables ; 30 cm.
Series: TR 56/04
Language: English
Subject: Roads -- Northern Territory -- Finke River Region
Road materials -- Northern Territory -- Testing
Subject Location: Finke River Region (N.T. and S. Aust.)
Citation address: http://hdl.handle.net/10070/267323
Access: Made available by the Northern Territory Library via the Publications (Legal Deposit) Act 2004 (NT).
Copyright owner: Check within Publication or with content Publisher.
Appears in Collections:E-Publications

Files in This Item:
File Description SizeFormat 
Finke Road Gravel Search Part 2.pdfTechnical report12.89 MBAdobe PDFThumbnail
View/Open
Show full item record


Items in Territory Stories are protected by copyright, with all rights reserved, unless otherwise indicated.