Territory Stories

Stuart Highway CH: 118.6 - 120.7 km - Geotechnical investigation

Details:

Title

Stuart Highway CH: 118.6 - 120.7 km - Geotechnical investigation,

Other title

Pavement investigation Stuart Highway Ch:118.6 - 120.7 km,

Creator

Douglas Partners Pty Ltd,

Commissioned by

Northern Territory. Department of Infrastructure, Planning and Environment,

Collection

E-Publications, E-Books, PublicationNT, Technical Report TR 09/05, Project 67021B,

Date

2005-04-06,

Abstract

This factual report details the results of the geotechnical investigation carried out on the existing pavement at Chainage 118.6 – 120.7km Stuart Highway, Northern Territory. The investigation comprised the excavation, logging and photography of four test pits (TP5 to TP8), supplemented by in-situ testing and laboratory testing on selected samples retained from the pits. Details of the field work and testing are given in this report.,

Notes

Prepared by Department of Infrastructure, Planning and Environment, Made available via the Publications (Legal Deposit) Act 2004 (NT).,

Table of contents

Introduction -- Site description -- Fieldwork -- Laboratory testing -- Appendix A-B,

Language

English,

Subject

Geotechnical investigation, Soil profile, Soil analysis, Subsurface conditions, Test pits, Roadworks,

Publisher name

Douglas Partners Pty Ltd,

Place of publication

Winnellie,

Series

Technical Report TR 09/05, Project 67021B,

Format

1 volume (various pagings) : colour illustrations, tables ; 30 cm,

File type

application/pdf,

Use

Copyright,

Copyright owner

Northern Territory Government and Douglas Partners Pty Ltd,

License

https://www.legislation.gov.au/Details/C2021C00407,

Parent handle

https://hdl.handle.net/10070/268260,

Citation address

https://hdl.handle.net/10070/438591