Territory Stories

Standard specification for road works 2015/2016

Details:

Title

Standard specification for road works 2015/2016

Collection

Standard specification for road works; Reports; PublicationNT

Date

2015

Description

Made available via the Publications (Legal Deposit) Act 2004 (NT).; Check within Publication or with content Publisher.

Notes

miscellaneous provisions ■ provision for traffic ■ clearing grubbing and rehabilitation ■ earthworks ■ conformance testing ■ pavements and shoulders ■ stabilisation ■ spray sealing ■ dense graded asphalt ■ slurry surfacing ■ miscellaneous concrete works ■ drainage works ■ protection works ■ road furniture and traffic control devices ■ pavement marking ■ landscape ■ ducting and conduits ■ traffic control signals ■ traffic counting stations ■ street lighting ■ directional (thrust) boring ■ measurement and payment ■ referenced documents ■ nt climate zones table ■ This document specifies the general standards of materials and workmanship required by the Department of Infrastructure for construction of civil road network assets

Language

English

Subject

Roads -- Northern Territory -- Works -- Periodicals.

Publisher name

Department of Infrastructure

Place of publication

Palmerston

Edition

Second edition

Parent handle

https://hdl.handle.net/10070/265830

Citation address

https://hdl.handle.net/10070/456054

Page content

CONFORMANCE TESTING STANDARD SPECIFICATION ROADWORKS DoI REFERENCE TEXT December 2015 Page 38 Table 5.6 - Test Frequencies For Soils Part 2 of 2 Type Of Test Subgrade Sub-Base Basecourse Pavement Layer Thickness by NTTM 216.1 - 1 per FDD 1 per FDD Ball Embedment by NTTM 215.1 - - 1 in 5,000 m2 Pavement Degree of Saturation prior to Sealing by AS 1289 - - 1 in 5,000 m2 Stabiliser Spread Rate by NTTM 204.7 1 per run * 1 per run 1 per run Stabiliser Content by NTTM 204.1 1 per 1000m2 with a min. of 3 tests 1 per 1000m2 with a min. of 3 tests 1 per 1000m2 with a min. of 3 tests Stabiliser Distribution by NTTM 204.8 1 per 1000m2 with a min. of 3 tests 1 per 1000m2 with a min. of 3 tests 1 per 1000m2 with a min. of 3 tests Soluble Salt Content of Construct. Water - - 1 per water source * run = 1 pass of cement spreader; FDD Field Dry Density; MMDD Maximum Modified Dry Density