Northern Territory. Department of Infrastructure, Planning and Logistics. Water Resource Branch,
Collection
E-Publications,
E-Books,
PublicationNT,
12/2017,
Water Resources Report No. D0846,
Date
2017-11-09,
Location
Katherine,
Abstract
WRM Water & Environment (WRM) was engaged by the Northern Territory Department of Infrastructure, Planning and Logistics (DIPL) to update the flood study for the township of Katherine and the surrounds. The previous flood study was undertaken in 2000 (Water Studies, 2000a). This study has been prompted by advances in modelling technologies and the availability of recent topographic data.,
Notes
Made available by via Publications (Legal Deposit) Act 2004 (NT),
Table of contents
1. Introduction -- 2. Previous flood studies -- 3. Catchment and drainage characteristics -- 4. Available data -- 5. Hydrologic model development, calibration and validation -- 6. Flood frequency analysis -- 7. Design hydrology -- 8. Hydraulic modelling -- 9. Model calibration -- 10. Design even flood mapping -- 11. Summary and conclusion -- 12. Recommendations -- 13. References -- Appendix A – URBS calibration and validation results -- Appendix B – Katherine Rive Peak annual discharges at Railway Bridge -- Appendix C – Design Flood maps,
Language
English,
Subject
Flood,
Modelling,
Katherine River,
Publisher name
Northern Territory Government,
Place of publication
Palmerston (NT),
Series
12/2017,
Water Resources Report No. D0846,
Format
137 pages : colour illustrations and maps ; 30 cm.,