Territory Stories

Alice Springs recreational dam

Details:

Title

Alice Springs recreational dam,

Other title

An economic comparison between two spillway alternatives,

Creator

Jackson, R., Russell, P.,

Issued by

Northern Territory. Department of Transport and Works. Water Division,

Collection

E-Publications, E-Books, PublicationNT, Report ; 13/1980,

Date

1980-04-01,

Description

Made available via the Publications (Legal Deposit) Act 2004 (NT).,

Abstract

This report mnnmarises earthworks volume calculations for the proposed Alice Springs Recreation Lake on the Todd River. Two alternative spillway operation ystems have been proposed by our consultant and are investigated herein. Alternativ~ A (spillway through saddle 4) is 17 percent more expensive than Al ternative 13 (spillway through saddle 1). Construction costs are $A3.8 million and $A3.2 million for Alternatives A and B respectively. Further detailed studies to assess minimum stripping depths, maximum cut batter slopes and energy dissipation requirements would decrease the total cost because of the conservative assumptions used.,

Notes

Date:1980-04, Project 6,

Table of contents

1. Introduction -- 2. Part A - Spillway Comparison -- 3. Part B Sensitivity Study -- List of Tables -- List of Figures,

Language

English,

Publisher name

Northern Territory Government,

Place of publication

Alice Springs,

Series

Report ; 13/1980,

Format

1 volume (unnumbered leaves) : illustrations and maps ; 30 cm.,

File type

application/pdf.,

Use

Attribution International 4.0 (CC BY 4.0),

Copyright owner

Northern Territory Government,

License

https://creativecommons.org/licenses/by/4.0,

Parent handle

https://hdl.handle.net/10070/228742,

Citation address

https://hdl.handle.net/10070/228742

Related items

https://hdl.handle.net/10070/673778,