Territory Stories

2015/2016 Standard specification for road maintenance

Details:

Title

2015/2016 Standard specification for road maintenance

Collection

Standard specification for road maintenance; Reports; PublicationNT

Date

2015

Description

Made available via the Publications (Legal Deposit) Act 2004 (NT).

Language

English

Subject

Roads -- Northern Territory -- Maintenance and Repairs -- Periodicals

Publisher name

Department of Infrastructure

Place of publication

Palmerston

Copyright owner

Check within Publication or with content Publisher.

Parent handle

https://hdl.handle.net/10070/305186

Citation address

https://hdl.handle.net/10070/360778

Page content

MEASUREMENT AND PAYMENT STANDARD SPECIFICATION FOR ROAD MAINTENANCE DoI REFERENCE TEXT October 2015 Page 221 Install Detector (Saw cut) 21.18.20 Measured by number. Payment will include the establishment of plant, labour, material and equipment required to install a vehicle detector in accordance with the Standard Drawing, connect to the controller, testing, and provide readings. If required detector feeder cable will be available from the Superintendents Representative unless directed otherwise. Install Detector (Pre-fabricated) 21.18.21 Measured by number. Payment will include the establishment of plant, labour, material and equipment required to install a pre-fabricated vehicle detector, connect to the controller, testing, and provide readings. Liaise with sealing or asphalt contractors to coordinate the works program accordingly. If required detector feeder cable will be available from the Superintendents Representative unless directed otherwise. Install Detector Pit 21.18.22 Measured by number. Payment will include the establishment of plant, labour, materials, sundries and equipment required to install a detector pit. The pit shall have 75mm of 20mm aggregate installed underneath the pit to allow for drainage, separated by a membrane to stop ingress of material into the pit. The pit shall have a tooled concrete surround supporting the pit, minimum of 100mm wide x 100mm deep. NOTE: The current standard drawing does not reflect this requirement and is soon to be updated. Different types of pits may be considered subject to Superintendents Representatives approval for use. Cost of detector pit is not included. Refer to Supply of Materials items. Pedestrian Button Test and 21.18.23 Repair / Replace Measured by number. Payment will include the establishment of plant, labour, sundries and equipment required to test and repair, and / or replace, a faulty or damaged pedestrian button. If the pedestrian button is deemed unrepairable by the contractor when sent to test and repair, and a new pedestrian button is required to be installed, this item will only be paid once for replacement. Items shall include disconnecting, reconnecting cables and testing the operation. Cost of Audio tactile driver card and pedestrian push button in not included. Refer to Supply of Materials items. Audio Tactile Test and Repair / 21.18.24 Replace Measured by number. Payment will include the establishment of plant, labour, sundries and equipment required to test and repair, and / or replace, a faulty or damaged audio tactile unit, including speaker. If the audio tactile component or speaker is deemed unrepairable by the contractor when sent to test and repair, and a new audio tactile component is required to be installed, this item will only be paid once for replacement of the item. Items shall include disconnecting, reconnecting cables and testing the operation. Cost of audio tactile unit, components or speaker is not included. Refer to Supply of Materials items. Test and Restore 21.18.25 Communications / SCATS Communications Measured by number. Payment will include the establishment of plant, labour, sundries and equipment required to test and repair communication links to SCATS or other ITS equipment. Cost of hardware material is not included. Superintendents Representative to advise of authorised suppliers. Supply and Connection of 21.18.26 Generator Measured by hours (Rounded up and payable in 30 minute blocks). Payment will include the establishment of plant, labour, sundries and equipment required to connect, secure and maintain the operation of a 15amp / 240 volt generator to a traffic signal controller box, or UPS to power and maintain the operation of traffic signalised sites and associated ITS as specified by the Superintendents Representative or Traffic Section staff. Payment includes attendance for disconnection at completion of use, and the first tank of fuel. Generators shall be tested on a site to prove suitability for use. Subsequent tanks of fuel will be paid as per Unscheduled Items. Install Multi Core Cable 21.18.27 including and below 21 cores Measured by Lineal Meter. Payment will include the establishment of plant, labour, sundries and equipment required to install multi core cable (including and below 16 core) and other cable such as data cable (fibre / cat 5/6) into an existing conduit/s, pits, and posts, and to remove any existing damaged cable from conduit if necessary. Note. Any fibre termination is not included within this rate.


Aboriginal and Torres Strait Islander people are advised that this website may contain the names, voices and images of people who have died, as well as other culturally sensitive content. Please be aware that some collection items may use outdated phrases or words which reflect the attitude of the creator at the time, and are now considered offensive.

We use temporary cookies on this site to provide functionality.
By continuing to use this site without changing your settings, you consent to our use of cookies.