2015/2016 Standard specification for road maintenance

Details:

Title

2015/2016 Standard specification for road maintenance

Collection

Standard specification for road maintenance; Reports; PublicationNT

Date

2015

Description

Made available via the Publications (Legal Deposit) Act 2004 (NT).

Language

English

Subject

Roads -- Northern Territory -- Maintenance and Repairs -- Periodicals

Publisher name

Department of Infrastructure

Place of publication

Palmerston

Copyright owner

Check within Publication or with content Publisher.

Parent handle

https://hdl.handle.net/10070/305186

Citation address

https://hdl.handle.net/10070/360778

Page content

SPRAY SEALING MAINTENANCE STANDARD SPECIFICATION FOR ROAD MAINTENANCE DoI REFERENCE TEXT October 2015 Page 63 Pavement Temperature, Ambient Temperature Start Chainage of spray run actual km of road End chainage of spray run actual km of road Total Length, Width of spray run Total area of spray run Temperature of product at spraying Start Dip, End Dip Total sprayed hot, Correction factor, Total sprayed cold Application rate cold Ordered application rate Percent of application rate ordered Number of rollers used Bitumen sample number Signature of contractor representative Signature section for client representative CONFORMANCE 7.19 Tolerances 7.19.1 Final surfaces shall conform to the following: Aggregates are to conform to Table 7.5 - Aggregate Properties. Refer to Clause 7.22 for Tables Skid resistance determined by NTTM 304.1. Final surfaces with non-conforming skid resistance will be rejected. Rectify non-conforming work by methods approved by the Superintendent. Rectification work is at the Contractors expense, including the cost of testing. Remove from the site binder which has been overheated or has deteriorated or become contaminated prior to its application to the road. Spray rates applied at less than 95% or more than 105% of the rate indicated in the procedure will be rectified by resurfacing at the Contractors expense inclusive of all materials. ADJUSTMENT TO VOLUMES FOR 7.20 SPRAY RATES This includes the prime coat, enrichment coat, emulsion coat, primerseal and seal coats. Refer to Table 7.9 - Bitumen Equivalent Volumes and MEASUREMENT AND PAYMENT CLAUSES for schedules of adjustments. OTHER REQUIREMENTS 7.21 (If applicable) Refer to PROJECT SPECIFIC REQUIREMENTS section of Request for Tender.


Aboriginal and Torres Strait Islander people are advised that this website may contain the names, voices and images of people who have died, as well as other culturally sensitive content. Please be aware that some collection items may use outdated phrases or words which reflect the attitude of the creator at the time, and are now considered offensive.

We use temporary cookies on this site to provide functionality.
By continuing to use this site without changing your settings, you consent to our use of cookies.