Mount Peake Project
Notice of Intent - Mount Peake; Statement of Reasons - Mount Peake; Terms of Reference for the preparation of an EIS - Mount Peake; Notice of Intent variation - Mount Peake; Draft EIS - Mount Peake; Addendum to Draft EIS - Mount Peake; Supplement to Draft EIS - Mount Peake
GHD Pty Ltd; Animal Plant Mineral Pty Ltd; Australian Museum Consulting
Northern Territory Environment Protection Authority
E-Publications; E-Books; PublicationNT
2013-06-01
TNG Ltd, under wholly owned subsidiary Enigma Mining Limited, is proposing to develop and operate the Mt Peake Project, a polymetallic (titanium, vanadium, iron) mine, located approximately 235 km north-northwest of Alice Springs in the Northern Territory (NT). GHD Pty Ltd (GHD) has been engaged by TNG to prepare the NOI and to progress environmental baseline studies and any approvals documentation for the Project.
Made available via the Publications (Legal Deposit) Act 2004 (NT).
Mount Peake Project Notice of Intent - NOI June 2013 -- Mount Peake Statement of Reasons - SOR November 2013 -- Mount Peake Terms of Reference for the preparation of an EIS - TOR March 2013 -- Mount Peake Notice of Intent variation - NOI Variation March 2015 -- Mount Peake Project Draft EIS Vol. 1 - Draft EIS February 2016 -- Assessment Report 85 -- Mount Peake Project Draft EIS Vol. 2 Appendices A - K Draft -- Mount Peake Project Draft EIS Vol. 3 Appendix L-O - Draft -- Mount Peake Project Addendum to Draft EIS Appendix 1-10 -- Mount Peake Project Supplement to Draft EIS - April 2017 -- Mount Peake Project Addendum to the Draft EIS - November 2017
English
Environmental impact statement; Environmental assessment; Iron mines and mining; Environmental aspects
TNG Limited
Subiaco
Volumes : colour illustrations, colour maps ; 30 cm.
application/pdf
Copyright
TNG Limited
https://www.legislation.gov.au/Details/C2019C00042
https://www.tngltd.com.au/project/mount-peake-v-ti-fe/ [Mount Peake V Ti Fe - TNG Limited]; https://hdl.handle.net/10070/396300 [Mount Peake Project Notice of Intent - NOI June 2013]; https://hdl.handle.net/10070/396301 [Mount Peake Statement of Reasons - SOR November 2013]; https://hdl.handle.net/10070/396303 [Mount Peake Terms of Reference for the preparation of an EIS - TOR March 2013]; https://hdl.handle.net/10070/396305 [Mount Peake Notice of Intent variation - NOI Variation March 2015]; https://hdl.handle.net/10070/396307 [Mount Peake Project Draft EIS Vol. 1 - Draft EIS February 2016]; https://hdl.handle.net/10070/396309 [Mount Peake Project Draft EIS Vol. 2 Appendices A - K Draft]; https://hdl.handle.net/10070/396311 [Mount Peake Project Draft EIS Vol. 3 Appendix L-O - Draft]; https://hdl.handle.net/10070/396314 [Mount Peake Project Supplement to Draft EIS - April 2017]; https://hdl.handle.net/10070/396315 [Mount Peake Project Addendum to the Draft EIS - November 2017]; https://hdl.handle.net/10070/396317 [Mount Peake Project Addendum to Draft EIS Appendix 1-10]; https://hdl.handle.net/10070/396319 [Assessment Report 85]
https://hdl.handle.net/10070/294504
https://hdl.handle.net/10070/396317
https://hdl.handle.net/10070/396300; https://hdl.handle.net/10070/396301; https://hdl.handle.net/10070/396303; https://hdl.handle.net/10070/396305; https://hdl.handle.net/10070/396307; https://hdl.handle.net/10070/396309; https://hdl.handle.net/10070/396311; https://hdl.handle.net/10070/396314; https://hdl.handle.net/10070/396315; https://hdl.handle.net/10070/396319
461/29057/08/162376 Revised groundwater modelling results Figure 2-2 Drawdown profile Hanson River alignment Table 2-3 Modelled drawdown at pastoral bores/wells Bore/well Distancefrom mine2 Distance from borefield3 Transient drawdown (4 yrs) Transient drawdown (17 yrs) Transient drawdown (100 yrs) Mudhut Bore 9 14 <0.05 <0.05 m <0.05 m Boko Bore 11 12 <0.05 m <0.05 m <0.05 m Browns Well 19 2 0.1 1.5 m 2.7 Wollogolong Bore 33 2 <0.05 m 1.9 m 2.0 m Middle Well (inactive) 28 0 3.6 8.4 m 3.3 m Mt Peake Creek Bore 22 9 <0.05 m <0.05 m <0.05 m Mistake Bore 20 24 <0.05 m <0.05 m <0.05 m Junction Well 28 14 <0.05 m <0.05 m 0.9 m Twin Soak Bore 45 15 <0.05 m <0.05 m 0.5 m Table 2-4 Water Balance at the End of Stage 1 (year 4) Water Balance Component Inflow (m3/d) Outflow (m3/d) Storage 3341 0 Recharge 1199 0 Constant head boundary 89 1288 Abstraction bores 3340 Total 4629 4628 Water Balance Error 0.02% 2 Distance from centroid of drawdown cone at mine (km) 3 Distance from centroid of drawdown cone at borefield (km)
Aboriginal and Torres Strait Islander people are advised that this website may contain the names, voices and images of people who have died, as well as other culturally sensitive content. Please be aware that some collection items may use outdated phrases or words which reflect the attitude of the creator at the time, and are now considered offensive.
We use temporary cookies on this site to provide functionality. |
Click on Related items to view images, documents, etc. associated with this item.
You are welcome to provide further information or feedback about this item by emailing TerritoryStories@nt.gov.au