Mount Peake Project
Notice of Intent - Mount Peake; Statement of Reasons - Mount Peake; Terms of Reference for the preparation of an EIS - Mount Peake; Notice of Intent variation - Mount Peake; Draft EIS - Mount Peake; Addendum to Draft EIS - Mount Peake; Supplement to Draft EIS - Mount Peake
GHD Pty Ltd; Animal Plant Mineral Pty Ltd; Australian Museum Consulting
Northern Territory Environment Protection Authority
E-Publications; E-Books; PublicationNT
2013-06-01
TNG Ltd, under wholly owned subsidiary Enigma Mining Limited, is proposing to develop and operate the Mt Peake Project, a polymetallic (titanium, vanadium, iron) mine, located approximately 235 km north-northwest of Alice Springs in the Northern Territory (NT). GHD Pty Ltd (GHD) has been engaged by TNG to prepare the NOI and to progress environmental baseline studies and any approvals documentation for the Project.
Made available via the Publications (Legal Deposit) Act 2004 (NT).
Mount Peake Project Notice of Intent - NOI June 2013 -- Mount Peake Statement of Reasons - SOR November 2013 -- Mount Peake Terms of Reference for the preparation of an EIS - TOR March 2013 -- Mount Peake Notice of Intent variation - NOI Variation March 2015 -- Mount Peake Project Draft EIS Vol. 1 - Draft EIS February 2016 -- Assessment Report 85 -- Mount Peake Project Draft EIS Vol. 2 Appendices A - K Draft -- Mount Peake Project Draft EIS Vol. 3 Appendix L-O - Draft -- Mount Peake Project Addendum to Draft EIS Appendix 1-10 -- Mount Peake Project Supplement to Draft EIS - April 2017 -- Mount Peake Project Addendum to the Draft EIS - November 2017
English
Environmental impact statement; Environmental assessment; Iron mines and mining; Environmental aspects
TNG Limited
Subiaco
Volumes : colour illustrations, colour maps ; 30 cm.
application/pdf
Copyright
TNG Limited
https://www.legislation.gov.au/Details/C2019C00042
https://www.tngltd.com.au/project/mount-peake-v-ti-fe/ [Mount Peake V Ti Fe - TNG Limited]; https://hdl.handle.net/10070/396300 [Mount Peake Project Notice of Intent - NOI June 2013]; https://hdl.handle.net/10070/396301 [Mount Peake Statement of Reasons - SOR November 2013]; https://hdl.handle.net/10070/396303 [Mount Peake Terms of Reference for the preparation of an EIS - TOR March 2013]; https://hdl.handle.net/10070/396305 [Mount Peake Notice of Intent variation - NOI Variation March 2015]; https://hdl.handle.net/10070/396307 [Mount Peake Project Draft EIS Vol. 1 - Draft EIS February 2016]; https://hdl.handle.net/10070/396309 [Mount Peake Project Draft EIS Vol. 2 Appendices A - K Draft]; https://hdl.handle.net/10070/396311 [Mount Peake Project Draft EIS Vol. 3 Appendix L-O - Draft]; https://hdl.handle.net/10070/396314 [Mount Peake Project Supplement to Draft EIS - April 2017]; https://hdl.handle.net/10070/396315 [Mount Peake Project Addendum to the Draft EIS - November 2017]; https://hdl.handle.net/10070/396317 [Mount Peake Project Addendum to Draft EIS Appendix 1-10]; https://hdl.handle.net/10070/396319 [Assessment Report 85]
https://hdl.handle.net/10070/294504
https://hdl.handle.net/10070/396317
https://hdl.handle.net/10070/396300; https://hdl.handle.net/10070/396301; https://hdl.handle.net/10070/396303; https://hdl.handle.net/10070/396305; https://hdl.handle.net/10070/396307; https://hdl.handle.net/10070/396309; https://hdl.handle.net/10070/396311; https://hdl.handle.net/10070/396314; https://hdl.handle.net/10070/396315; https://hdl.handle.net/10070/396319
No. COMMITMENT PERFORMANCE INDICATOR TIMEFRAME LOCATION incorporation of appropriate signposting to avoid or minimise any impact on other road users. 296. Design of Amadeus Gas Pipeline protection measures in consultation with pipeline operator, APA Group. Audits/ Inspections Stakeholder Consultation Register EMS/ Record keeping Construction Draft EIS - Ch 2 Project Description p11 297. Road trains used to transport concentrate will be highway compliant and will operate under shared usage conditions with other highway compliant vehicles. Contractor agreements Audits/ Inspections Operations Draft EIS - Ch 2 Project Description p22 298. Develop an Emergency Response Plan. Emergency Response Plan EMS/ Record keeping Construction Draft EIS - Ch 5 Environmental Risk Assessment p13 299. Develop and implement a Traffic Management Plan Traffic Management Plan EMS/ Record keeping Pre-production Draft EIS - Ch5 Environmental Risk Assessment p13; p35 300. Upgrade high use transport areas to be safer for vehicles and fauna (e.g. no blind curves, wider shrub-free verges) Audits/ Inspections Construction Draft EIS - Ch5 Environmental Risk Assessment p35; p42 301. A stock fence will be installed along both sides of the haul/ access road to exclude cattle. No fauna aggregation points (e.g. for stock watering) will be present within the fenced corridor and no transit pathways cross the corridor. The fence will be regularly inspected, and any repairs made as necessary. Audits/ Inspections Construction Draft EIS - Ch5 Environmental Risk Assessment p13; Supplement Ch4 Responses to Submissions on the Draft EIS p3 302. Provide road safety and awareness training to all staff and contractors. Training/ Inductions Construction/ Operations Draft EIS - Ch5 Environmental Risk Assessment p42 303. Apply reduced speed limits for vehicles travelling at night. Training/ Inductions Construction/ Operations Draft EIS - Ch5 Environmental Risk Assessment p42 304. Limit vehicle speeds in all locations where roads cross waterways. Training/ Inductions Signage Construction/ Operations Draft EIS - Ch5 Environmental Risk Assessment p42 305. Use of pooled vehicles such as buses where practical to minimise exposure. Traffic Management Plan Construction/ Operation APM Supplement - Risk Assessment Table 306. Trains operated by appropriately experienced and qualified personnel that comply with NT and Australian requirements. Traffic Management Plan Construction/ Operation APM Supplement - Social Impact Management Plan 307. Traffic diversion delays in accordance with Australian Standards. Traffic Management Plan Construction/ Operation APM Supplement - Social Impact Management Plan, Table 4-1 308. A two-tiered exclusion fence is proposed to surround the pit. Mine Management Plan Closure EIS Addendum, Section 3.2.1.4 Impacts to Archaeological / Heritage Sites
Aboriginal and Torres Strait Islander people are advised that this website may contain the names, voices and images of people who have died, as well as other culturally sensitive content. Please be aware that some collection items may use outdated phrases or words which reflect the attitude of the creator at the time, and are now considered offensive.
We use temporary cookies on this site to provide functionality. |
Click on Related items to view images, documents, etc. associated with this item.
You are welcome to provide further information or feedback about this item by emailing TerritoryStories@nt.gov.au