Territory Stories

Mount Peake Project

Details:

Title

Mount Peake Project

Other title

Notice of Intent - Mount Peake; Statement of Reasons - Mount Peake; Terms of Reference for the preparation of an EIS - Mount Peake; Notice of Intent variation - Mount Peake; Draft EIS - Mount Peake; Addendum to Draft EIS - Mount Peake; Supplement to Draft EIS - Mount Peake

Creator

GHD Pty Ltd; Animal Plant Mineral Pty Ltd; Australian Museum Consulting

Issued by

Northern Territory Environment Protection Authority

Collection

E-Publications; E-Books; PublicationNT

Date

2013-06-01

Abstract

TNG Ltd, under wholly owned subsidiary Enigma Mining Limited, is proposing to develop and operate the Mt Peake Project, a polymetallic (titanium, vanadium, iron) mine, located approximately 235 km north-northwest of Alice Springs in the Northern Territory (NT). GHD Pty Ltd (GHD) has been engaged by TNG to prepare the NOI and to progress environmental baseline studies and any approvals documentation for the Project.

Notes

Made available via the Publications (Legal Deposit) Act 2004 (NT).

Table of contents

Mount Peake Project Notice of Intent - NOI June 2013 -- Mount Peake Statement of Reasons - SOR November 2013 -- Mount Peake Terms of Reference for the preparation of an EIS - TOR March 2013 -- Mount Peake Notice of Intent variation - NOI Variation March 2015 -- Mount Peake Project Draft EIS Vol. 1 - Draft EIS February 2016 -- Assessment Report 85 -- Mount Peake Project Draft EIS Vol. 2 Appendices A - K Draft -- Mount Peake Project Draft EIS Vol. 3 Appendix L-O - Draft -- Mount Peake Project Addendum to Draft EIS Appendix 1-10 -- Mount Peake Project Supplement to Draft EIS - April 2017 -- Mount Peake Project Addendum to the Draft EIS - November 2017

Language

English

Subject

Environmental impact statement; Environmental assessment; Iron mines and mining; Environmental aspects

Publisher name

TNG Limited

Place of publication

Subiaco

Format

Volumes : colour illustrations, colour maps ; 30 cm.

File type

application/pdf

Use

Copyright

Copyright owner

TNG Limited

License

https://www.legislation.gov.au/Details/C2019C00042

Related links

https://www.tngltd.com.au/project/mount-peake-v-ti-fe/ [Mount Peake V Ti Fe - TNG Limited]; https://hdl.handle.net/10070/396300 [Mount Peake Project Notice of Intent - NOI June 2013]; https://hdl.handle.net/10070/396301 [Mount Peake Statement of Reasons - SOR November 2013]; https://hdl.handle.net/10070/396303 [Mount Peake Terms of Reference for the preparation of an EIS - TOR March 2013]; https://hdl.handle.net/10070/396305 [Mount Peake Notice of Intent variation - NOI Variation March 2015]; https://hdl.handle.net/10070/396307 [Mount Peake Project Draft EIS Vol. 1 - Draft EIS February 2016]; https://hdl.handle.net/10070/396309 [Mount Peake Project Draft EIS Vol. 2 Appendices A - K Draft]; https://hdl.handle.net/10070/396311 [Mount Peake Project Draft EIS Vol. 3 Appendix L-O - Draft]; https://hdl.handle.net/10070/396314 [Mount Peake Project Supplement to Draft EIS - April 2017]; https://hdl.handle.net/10070/396315 [Mount Peake Project Addendum to the Draft EIS - November 2017]; https://hdl.handle.net/10070/396317 [Mount Peake Project Addendum to Draft EIS Appendix 1-10]; https://hdl.handle.net/10070/396319 [Assessment Report 85]

Parent handle

https://hdl.handle.net/10070/294504

Citation address

https://hdl.handle.net/10070/396317

Related items

https://hdl.handle.net/10070/396300; https://hdl.handle.net/10070/396301; https://hdl.handle.net/10070/396303; https://hdl.handle.net/10070/396305; https://hdl.handle.net/10070/396307; https://hdl.handle.net/10070/396309; https://hdl.handle.net/10070/396311; https://hdl.handle.net/10070/396314; https://hdl.handle.net/10070/396315; https://hdl.handle.net/10070/396319

Page content

No. COMMITMENT PERFORMANCE INDICATOR TIMEFRAME LOCATION 415. Where haul roads disrupt surface drainage, excavation will occur at low points to re-establish natural drainage paths. Audits/ Inspections Rehabilitation Strategy Closure and Rehabilitation Plan Water Management Plan Closure Draft EIS Ch16 Rehabilitation and Mine Closure p11 416. Once surface infrastructure is removed, any surface staining from hydrocarbons will be removed and taken to the bioremediation area. Closure and Rehabilitation Plan EMS/ Record keeping Audits/ Inspections Closure Draft EIS App M Conceptual MCP p29 417. Any visual staining from hydrocarbons beyond the surface zone will be the subject of a sampling program to quantify the likely further extent of contamination. Mine Closure Plan EMS/ Record keeping Audits/ Inspections Reporting Closure Draft EIS App M Conceptual MCP p30 418. If initial sampling indicates significant contamination levels remain in-situ, a remediation plan will be developed to remove or remediate the contamination. Remediation Plan Monitoring results EMS/ Record keeping Closure Draft EIS App M Conceptual MCP p30 Mine Closure - Integrated Waste Landform 419. Outer slopes of the facility will be battered to the conceptual design shown in Figure 16-9 (Draft EIS Ch16, p11) or an alternative design approved by a suitably qualified geotechnical engineer. Audits/ Inspections EMS/ Record keeping Closure and Rehabilitation Plan Closure Draft EIS Ch16 Rehabilitation and Mine Closure p10 420. Water runoff from the outer slopes of the landform will be contained by a toe drain/ bund wall and directed to a sump(s) prior to release into natural drainage systems. Audits/ Inspections Closure and Rehabilitation Plan Operations/ Closure Draft EIS Ch16 Rehabilitation and Mine Closure p10 421. Surface will be covered with topsoil, ripped and seeded. Closure and Rehabilitation Plan Audits/ Inspections EMS/ Record keeping Closure Draft EIS Ch16 Rehabilitation and Mine Closure p10 422. Water quality parameters in groundwater monitoring bores do not exceed values representative of analogue sites and/ or baseline data Baseline surveys Groundwater monitoring Closure and Rehabilitation Plan Water Management Plan Operations/ Closure Draft EIS Ch16 Rehabilitation and Mine Closure p6 423. Monitoring bores will be sampled post-closure (for up to 5 years) Annual Environmental reporting Closure and Rehabilitation Plan EMS/ Record keeping Closure Draft EIS App M Conceptual MCP p26


Aboriginal and Torres Strait Islander people are advised that this website may contain the names, voices and images of people who have died, as well as other culturally sensitive content. Please be aware that some collection items may use outdated phrases or words which reflect the attitude of the creator at the time, and are now considered offensive.

We use temporary cookies on this site to provide functionality.
By continuing to use this site without changing your settings, you consent to our use of cookies.