Budget 2013/14 Northern Territory Economy
Tabled paper 295
Tabled papers for 12th Assembly 2012 - 2016; Tabled papers; ParliamentNT
2013-05-14
Tabled by David Tollner
Made available by the Legislative Assembly of the Northern Territory under Standing Order 240. Where copyright subsists with a third party it remains with the original owner and permission may be required to reuse the material.
English
Tabled papers
Department of the Treasury and Finance
application/pdf
Copyright
See publication
https://www.legislation.gov.au/Details/C2019C00866
https://hdl.handle.net/10070/273751
https://hdl.handle.net/10070/426369
Defence 195 Northern Territory Economy approximately $83.8 million, with a further eight houses anticipated to be completed by 30 June 2013. The finished properties were in Bellamack (13), Larrakeyah (69) and Muirhead (50), with the eight properties still under construction all located in Bellamack. The addition of these new properties to DHAs portfolio is anticipated to be offset by the release of older housing stock onto the private market. Defence Housing Developments The Darwin suburb of Lyons was a joint venture between DHA and CICAustralia. Redevelopment of the 700 lots began in mid-2007 and was finished in mid-2011. DHA has retained 345 houses for the use of defence personnel and their families. With the completion of Lyons, DHA is focusing on the construction of the adjoining suburb of Muirhead in partnership with Investec Australia. Muirhead comprises 152 hectares of land and has capacity for 1200dwellings, of which DHA intends to retain 330. Construction of the 166 lot Muirhead stage 1 began in late 2011 and was completed in late 2012. DHA has retained 50 houses from stage 1 for defence use. The 515-lot stages 2 and 3 of the Muirhead development are now under construction and are anticipated to yield 576 dwellings, of which DHA intends to retain 100 dwellings (50 from each stage). Construction of Zuccoli stage 1 began in mid-2012 and is expected to deliver up to 500 residential lots. DHA has an option to acquire 15percent of Zuccoli lots. DHA has so far taken up 21 of 141 lots in stages 1.1 and 1.2of the development. DHA currently has 43 properties in Bellamack with an additional eight under construction and anticipated to be completed by 30 June 2013. There are currently 23 DHA houses in Johnston with no plans for additional future construction work. As part of the ADFs Project Single Living Environment and Accommodation Precinct (Project Single LEAP), an additional 232 units are now under construction at Larrakeyah Barracks in Darwin. The project is due for completion in the third quarter of 2013. In addition, DHA is currently replacing 61 existing substandard dwellings with 97 new dwellings over the coming years. In the financial year to 31March 2013, DHA had completed construction of 69 of these dwellings. Project Single LEAP includes the delivery of 686 units by SitzlerPtyLtd at RobertsonBarracks. Construction has begun and is expected to be completed in the first quarter of 2014. DHA began to replace 253 houses on RAAF Base Darwin in the suburb of Eaton that were deemed beyond economic repair. Stage 1 began in late 2012 and includes the replacement of 97 existing dwellings with new dwellings. Further staged works are expected, with completion expected in late 2014 or early 2015. Lyons Muirhead Zuccoli Bellamack Johnston Larrakeyah Barracks RobertsonBarracks RAAF Base Darwin
Aboriginal and Torres Strait Islander people are advised that this website may contain the names, voices and images of people who have died, as well as other culturally sensitive content. Please be aware that some collection items may use outdated phrases or words which reflect the attitude of the creator at the time, and are now considered offensive.
We use temporary cookies on this site to provide functionality. |
You are welcome to provide further information or feedback about this item by emailing TerritoryStories@nt.gov.au