Territory Stories

Standard specification for road works 2015/2016

Details:

Title

Standard specification for road works 2015/2016

Collection

Standard specification for road works; Reports; PublicationNT

Date

2015

Description

Made available via the Publications (Legal Deposit) Act 2004 (NT).; Check within Publication or with content Publisher.

Notes

miscellaneous provisions ■ provision for traffic ■ clearing grubbing and rehabilitation ■ earthworks ■ conformance testing ■ pavements and shoulders ■ stabilisation ■ spray sealing ■ dense graded asphalt ■ slurry surfacing ■ miscellaneous concrete works ■ drainage works ■ protection works ■ road furniture and traffic control devices ■ pavement marking ■ landscape ■ ducting and conduits ■ traffic control signals ■ traffic counting stations ■ street lighting ■ directional (thrust) boring ■ measurement and payment ■ referenced documents ■ nt climate zones table ■ This document specifies the general standards of materials and workmanship required by the Department of Infrastructure for construction of civil road network assets

Language

English

Subject

Roads -- Northern Territory -- Works -- Periodicals.

Publisher name

Department of Infrastructure

Place of publication

Palmerston

Edition

Second edition

Parent handle

https://hdl.handle.net/10070/265830

Citation address

https://hdl.handle.net/10070/456054

Page content

MEASUREMENT AND PAYMENT STANDARD SPECIFICATION ROADWORKS DoI REFERENCE TEXT December 2015 Page 155 Make allowance for any supply required, and spreading. 23.16.3 Trees, Shrubs and Ground Covers Measured by number of each type of genus and species. Make allowance for supply of plants, mulch, fertilisers, excavation of planting holes, and planting. 23.16.4 Irrigation Measured as an item. Make allowance for any design requirements, cost of approvals and connection to the water supply, cost of testing, and provision of as constructed drawings. 23.16.5 Grassing Measured in square metres. Make allowance for reseeding. 23.16.6 Watering Measured as an item. Note that cost of water will be borne by the Superintendent. 23.17 DUCTING AND CONDUITS 23.17.1 Electrical Ducting Measured in linear metres. Make allowance for excavation and backfilling trenches, marker tapes, draw wires and kerb markers. 23.17.2 Water Ducting Measured in linear metres. Make allowance for excavation and backfilling trenches, marker tapes, draw wires and kerb markers. 23.17.3 Conduit Markers Measured by number. 23.18 TRAFFIC CONTROL SIGNALS 23.18.1 Supply and Install Pedestals and Footings Measured by number. 23.18.2 Supply and Install Highmast Pedestals and Footings Measured by number. 23.18.3 Supply and Install Non-standard Pedestals and Footings Measured by number. 23.18.4 Supply and Install Vehicle and Pedestrian Signal Lanterns Measured by number. Make allowance for terminal assembly, target boards, cowls and louvres, and all ancillary items. 23.18.5 Install and Commission Controller Measured as an item. Make allowance for all ancillary items such as surge reduction filter and earth stake. 23.18.6 Supply, Install and Test Multicore Connecting Cable Measured in linear metres. 23.18.7 Supply, Install and Test Detector Loop Feeder Cables Measured in linear metres. 23.18.8 Supply and Install Detector Loops Measured by number. 23.18.9 Provision of Power Connection Measured as an item. 23.18.10 Supply and Install Conduits Measured in linear metres. Make allowance for draw wires, end caps, and ancillary items. 23.18.11 Supply and Install Conduit Junction Pits Measured by number. 23.18.12 Supply and Install Detector Pits Measured by number. 23.18.13 Supply and Install Pedestrian Push Button and Audio-tactile Assemblies Measured by number. 23.18.14 Supply and Install Communications Isolation Pillar Measured as an item. 23.18.15 Documents and Plans Measured as an item. 23.18.16 Provision of Communications Line Measured by number. 23.19 TRAFFIC COUNTING STATIONS 23.19.1 Install Cabinet Measured as an item. Make allowance for supply and installation of terminal blocks and switchboard. Make allowance for drawing of labelled loop layout and terminal blocks. 23.19.2 Construction of Pole Foundation Measured as an item. Make allowance for excavation, reinforcement and rag bolts. 23.19.3 Supply and Install Vehicle Loop Detectors Measured by number.