miscellaneous provisions ■ provision for traffic ■ clearing grubbing and rehabilitation ■ earthworks ■ conformance testing ■ pavements and shoulders ■ stabilisation ■ spray sealing ■ dense graded asphalt ■ slurry surfacing ■ miscellaneous concrete works ■ drainage works ■ protection works ■ road furniture and traffic control devices ■ pavement marking ■ landscape ■ ducting and conduits ■ traffic control signals ■ traffic counting stations ■ street lighting ■ directional (thrust) boring ■ measurement and payment ■ referenced documents ■ nt climate zones table ■ This document specifies the general standards of materials and workmanship required by the Department of Infrastructure for construction of civil road network assets

Language

English

Subject

Roads -- Northern Territory -- Works -- Periodicals.

Publisher name

Department of Infrastructure

Place of publication

Palmerston

Edition

Second edition

Parent handle

https://hdl.handle.net/10070/265830

Citation address

https://hdl.handle.net/10070/456054

Page content

CONFORMANCE TESTING STANDARD SPECIFICATION ROADWORKS DoI REFERENCE TEXT December 2015 Page 42 Table 5.10 Testing and Reporting Completion Times Part 2 of 2 Attribute being tested Time Allowed for Interim Report in Working Days (Monday to Friday) Time Allowed for NATA Endorsed Report in Working Days (Monday to Friday) AGGREGATE (contd) Los Angeles Value 2 4 Pavement Surface Texture Depth 2 Crushed Particles 2 Sulphate Soundness 8 10 CONCRETE Consistency of Concrete Slump Test 1 3 Making, Curing and Compressive Strength (28 day result) *** 29 31 Making, Curing and Compressive Strength (7 day result) *** 8 10 ASPHALT Bitumen Content and Aggregate Grading 3 5 Stability and Flow of Mix 3 Air Voids and Density Relationship 4 6 Density of Thin Lift Asphalt by Nuclear Gauge 2 4 Bulk Density of Asphalt 4 6 Kinematic Viscosity of Bitumen 3 5 BITUMEN Dynamic Viscosity (60C) 1 3 ** Time for completion may be extended by each additional day required for the curing of materials and each additional overnight stay. *** From Date of Sampling. Lot Testing 5.10.1 Conformance of compaction will be based on lots. Give each lot a lot number. Number the lots using a logical system. Maintain a register of all lots and lot numbers. Include the location of each lot on the lot register. Provide a copy of the lot register to the Superintendent upon request. Lots defined by the contractor must be clearly marked out on the construction site. Lots of work will be selected by the Contractor, based upon: - A lot will represent no more than one shift's production. - A lot will be continuous and will have been brought to completion at the same time. - A lot will be composed of essentially homogeneous material with no distinct changes in attribute values. Each lot will be subject to conformance testing in accordance with NTCP 102.1. Defective sections will be excluded from the lot to be tested and identified as a separate lot, and will also be subjected to lot testing. Quality of the lot will be judged as conformance or non-conformance of each lot. This will be based on all tests conducted on the lot in accordance with NTCP 102.1.