Territory Stories

Standard specification for road works 2015/2016

Details:

Title

Standard specification for road works 2015/2016

Collection

Standard specification for road works; Reports; PublicationNT

Date

2015

Description

Made available via the Publications (Legal Deposit) Act 2004 (NT).; Check within Publication or with content Publisher.

Notes

miscellaneous provisions ■ provision for traffic ■ clearing grubbing and rehabilitation ■ earthworks ■ conformance testing ■ pavements and shoulders ■ stabilisation ■ spray sealing ■ dense graded asphalt ■ slurry surfacing ■ miscellaneous concrete works ■ drainage works ■ protection works ■ road furniture and traffic control devices ■ pavement marking ■ landscape ■ ducting and conduits ■ traffic control signals ■ traffic counting stations ■ street lighting ■ directional (thrust) boring ■ measurement and payment ■ referenced documents ■ nt climate zones table ■ This document specifies the general standards of materials and workmanship required by the Department of Infrastructure for construction of civil road network assets

Language

English

Subject

Roads -- Northern Territory -- Works -- Periodicals.

Publisher name

Department of Infrastructure

Place of publication

Palmerston

Edition

Second edition

Parent handle

https://hdl.handle.net/10070/265830

Citation address

https://hdl.handle.net/10070/456054

Page content

DENSE GRADED ASPHALT STANDARD SPECIFICATION ROADWORKS DoI REFERENCE TEXT December 2015 Page 75 9.13 TABLES Table 9.8 Surface Shape Requirements Layer Deviation Below 3m Straight Edge (mm) Freeways and Highways with High Speed Traffic Heavy and Very Heavy Traffic Roads Medium and Light Traffic Roads Parallel to Centreline Transverse to Centreline Parallel to Centreline Transverse to Centreline Parallel to Centreline Transverse to Centreline Wearing Course 3 5 5 7 7 10 Intermediate and Base 6 10 8 12 12 16 Table 9.9 - Characteristic Value of Air Voids Reduction Level Light Traffic Medium Traffic Heavy Traffic Conformance 3.0 8.0 3.0 8.0 3.0 7.0 Reduction Level 1 8.1 9.0 8.1 9.0 7.1 8.0 Reduction Level 2 9.1 10.0 9.1 10.0 8.1 9.0 Reduction Level 3 > 10.1 and < 3.0 > 10.1 and < 3.0 > 9.1 and < 3.0 9.14 OTHER REQUIREMENTS Refer to PROJECT SPECIFIC REQUIREMENTS in the RFT.