Territory Stories

2009 Corporate total asset management plan

Details:

Title

2009 Corporate total asset management plan

Other title

Darwin City Council

Collection

City of Darwin reports; Reports; PublicationNT

Date

2009

Description

Made available via the Publications (Legal Deposit) Act 2004 (NT).

Notes

Date:2009

Language

English

Subject

Darwin(N.T.) -- Council -- Periodicals

Publisher name

Darwin City Council

Place of publication

Darwin

Copyright owner

Check within Publication or with content Publisher.

Parent handle

https://hdl.handle.net/10070/240707

Citation address

https://hdl.handle.net/10070/621982

Page content

63 Corporate Asset Management Plan CCoorrppoorraattee AAsssseett MMaannaaggeemmeenntt PPllaann Capital upgrade expenditure: Expenditure, which enhances an existing asset to provide a higher level of service or expenditure that will increase the life of the asset beyond that which it had originally. Upgrade expenditure is discretional and often does not result in additional revenue unless direct user charges apply. It will increase operating and maintenance expenditure in the future because of the increase in the councils asset base, eg. widening the sealed area of an existing road, replacing drainage pipes with pipes of a greater capacity, enlarging a grandstand at a sporting facility. Where capital projects involve a combination of renewal, expansion and/or upgrade expenditures, the total project cost needs to be allocated accordingly. Carrying amount: The amount at which an asset is recognised after deducting any accumulated depreciation / amortisation and accumulated impairment losses thereon. Cost of an asset: The amount of cash or cash equivalents paid or the fair value of the consideration given to acquire an asset at the time of its acquisition or construction, plus any costs necessary to place the asset into service. This includes one-off design and project management costs. Current replacement cost (CRC): The cost the entity would incur to acquire the asset on the reporting date. The cost is measured by reference to the lowest cost at which the gross future economic benefits could be obtained in the normal course of business or the minimum it would cost, to replace the existing asset with a technologically modern equivalent new asset (not a second hand one) with the same economic benefits (gross service potential) allowing for any differences in the quantity and quality of output and in operating costs. Current replacement cost As New (CRC): The current cost of replacing the original service potential of an existing asset, with a similar modern equivalent asset, i.e. the total cost of replacing an existing asset with an as NEW or similar asset expressed in current dollar values. Cyclic Maintenance**: Replacement of higher value components/sub-components of assets that is undertaken on a regular cycle including repainting, building roof replacement, cycle, replacement of air conditioning equipment, etc. This work generally falls below the capital/ maintenance threshold and needs to be identified in a specific maintenance budget allocation. Customer: Any person or group that uses a product or service supplied by Council. Demand Management: Strategies to influence the demand for an asset or service in such a way as to satisfy the real needs within the available resource allocations, typically to avoid or defer capital expenditure. Economic life: See useful life definition.


Aboriginal and Torres Strait Islander people are advised that this website may contain the names, voices and images of people who have died, as well as other culturally sensitive content. Please be aware that some collection items may use outdated phrases or words which reflect the attitude of the creator at the time, and are now considered offensive.

We use temporary cookies on this site to provide functionality.
By continuing to use this site without changing your settings, you consent to our use of cookies.