Bore completion report. Bore 27617. Pigeon hole dlh-693 excision.
Sanders, R.
E-Publications; ebooks; E-Books; PublicationNT; 101/90D
1990
Made available via the Publications (Legal Deposit) Act 2004 (NT).
Date:1990
English
101/90D
application/pdf.
Check within Publication or with content Publisher.
https://hdl.handle.net/10070/229597
https://hdl.handle.net/10070/672806
Technical Report WRD90101 Viewed at 15:07:43 on 29/07/2010 Page 11 of 12. P01Y~R~ WATER~ WATER RESOURCES DIVISION AUTHORITY TEST REPORT - BORE RN. 27617 Bore Location: PIGEON EOLE. Map: PIGEON. SEEET 5164. 1:100,000. Grid Reference: 366 - 395. Client: AES. KATHERINE. Reference: Purpose: DOMESTIC. ******************************************************************************** RECOMMENDATION Pumping Rate: 4 lis. Pump Setting: 25 m below Ground Level. General recommendations are given on the reverse side. The aquifer and bore cannot sustain higher pumping rates with deeper pump settings or for short periods in favourable seasons. Further advice can be obtained from: [In all correspondence please refer to bores RN number} Water Resources, SASCO Eouse, DARWIN NT. ******************************************************************************** BORE DATA Finished depth: 35.69 Standing Water Level: Construction details: Interval o - 6.00m o - 28.29m 28.29 - 30.33m 30.33 - 36.34m m. Completion Date:15f6/91. Test Date 11.95 m. on 12f6/91 Test Rates Test Duration ; Description 203mm ID. steel caSing. 156mm ID. steel caSing. 146mm ID. SIS. screen 156mm ID. steel sump. 19/6/91: 4 LIs. 5 hrs. Imm aperture. Notes: 1. 2. 3. Top of casing as constructed was 0.9 m above ground. All depths are measured from natural ground level. WARNING: Test rates are not indicative of safe long term pumping rates. MINIMUM INTER.l'lAL BORE DIAMETER IS 146 mm Nominal Size. ******************************************************************************** COMMENTS 1. The above recommendatioms are based on a ser~es of tests at 4 l/s for 5 hrs and assume hydrological conditions remain constant. 2. Provision to obtain water samples at bore head should be incorporated in the reticulation. 3. Provision to monitor water levels should be provided when equipping this bore. 4. For rates less than 4 l/s., a pump setting of 18m. would be adequate. ******************************************************************************** WATER QUALITY See water laboratory report Analysis No 9l/92/(]!)I1F Prepared by: P REES TO.l boredata2
Aboriginal and Torres Strait Islander people are advised that this website may contain the names, voices and images of people who have died, as well as other culturally sensitive content. Please be aware that some collection items may use outdated phrases or words which reflect the attitude of the creator at the time, and are now considered offensive.
We use temporary cookies on this site to provide functionality. |
You are welcome to provide further information or feedback about this item by emailing TerritoryStories@nt.gov.au