Alice Springs town basin, review 2003
Read, R. E.
E-Publications; E-Books; PublicationNT; Report ; no. 42/2003
2003-12-01
Made available via the Publications (Legal Deposit) Act 2004 (NT).
Date:2003-12
English
Department of Infrastructure, Planning and Environment
Alice Springs
Report ; no. 42/2003
application/pdf.
Check within Publication or with content Publisher.
https://hdl.handle.net/10070/229443
https://hdl.handle.net/10070/672980
I- 6 0.01 0.1 1 10 B parameter m/(L/s) at 100 minutes 0.001 0.01 0.1 1 C p ar am et er , m /(L /s )2 Y = 0.0105X1.063 Number of data points used = 17 Coef of determination, R-squared = 0.719528 Figure I- 5 Relation of B and C parameters 0.0001 0.001 0.01 0.1 1/Transmissivity d/m2 0.01 0.1 1 10 B m /(l /s) 2 Fit 1: Through origin 150 mm screens Equation Y = 30.42011422 * X Number of data points used = 4 Coef of determination, R-squared = 0.744793 Residual mean square, sigma-hat-sq'd = 0.0879655 Fit 1: Through origin 345 mm screens Equation Y = 80.46645814 * X Number of data points used = 13 Coef of determination, R-squared = 0 .951149 150 mm diameter 210 mm diameter 345 mm diameter 610 mm diameter Figure I- 6 Relation between B and 1/transmissivity