Territory Stories

A review report : recreational use of water storages in the Darwin Region.

Details:

Title

A review report : recreational use of water storages in the Darwin Region.

Collection

E-Publications; E-Books; PublicationNT; Report ; 17/1979

Date

1979-02-26

Description

Made available via the Publications (Legal Deposit) Act 2004 (NT).

Notes

Date:1979

Language

English

Publisher name

Dept. of the Northern Territory

Place of publication

Darwin

Series

Report ; 17/1979

File type

application/pdf.

Copyright owner

Check within Publication or with content Publisher.

Parent handle

https://hdl.handle.net/10070/229262

Citation address

https://hdl.handle.net/10070/673180

Page content

Technical Report WRD79017 Viewed at 23:02:44 on 17/02/2010 Page 19 of 52. q~lar f~cilities at ~~ton Dam, together with the removal of st,qnding timber from the storage, is estimated t "0 - '11' tv cos ~ .. , ml _~on~ The annual cost of controlling actilities would be in the order of $;00,000. Summarising preliminary estimat~s: Capital Costs Treatment facilities Prep2ration of Ilarwin River Dam Preparation of Manton Dam Control of recreational activities 6.0 1.6 0.5 8.1 $ Million O.? J<'u.1l,v Treat Water f-"om Manton Dam and permit r~creaticr.al use thereof. Annual Costs 1,,0 0.1 1 1 If treatment facilities are to be provided for the Ilarwin water supply, it would be desirable to first establish an experimental pilot plant to determine the most appropriate proce~ses and optimum chemical dosing rates. It is envisaged that an 18 Ml/aay plant may be established above McMinns with flexibility to treat maxjrrmin day supply from Manton Dam or, experimentally, partial supply from Ilarwin River Dam. The order of capita". cost would be $1.2 million with annual costs of $200,000 (excluding cost of preparatory works and ccntrol). 8.3 l?u.!np from Dantin River Dam to Manton Dam which would be used .:.t.S a tel"'lJlinal water st('rage leaving Darwi..'l River Dam a'-ailable for recreational use. This concept relies on a retention system to improve the quality of stored water. Water would be pumped from c. new intake tower in the Ilarwin River Dam to Manton Dam and thence by new pumps through new pipelines to Mc~s. The order of cost of two pumpi.~ soaolons, river intake and pipelines would be $ 20 million with annual costs of $200,000. "l t sho,~ld be noted that if Blackmore River is developed as a c;i ty -..rati::::'r ;JOi.U"Cf~ the Da...cwin RiVEr Dam will no longer be a t(~rminal 'S torag':". 8-2


Aboriginal and Torres Strait Islander people are advised that this website may contain the names, voices and images of people who have died, as well as other culturally sensitive content. Please be aware that some collection items may use outdated phrases or words which reflect the attitude of the creator at the time, and are now considered offensive.

We use temporary cookies on this site to provide functionality.
By continuing to use this site without changing your settings, you consent to our use of cookies.