Arafura swamp water resources study
Williams, D.; Chudleigh, I.; Jolly, P.
E-Publications; E-Books; PublicationNT; Report ; 45/2003
2003
Made available via the Publications (Legal Deposit) Act 2004 (NT).
Date:2003
English
Dept. of Infrastructure, Planning and Environment
Darwin
Report ; 45/2003
application/pdf.
Check within Publication or with content Publisher.
https://hdl.handle.net/10070/229247
https://hdl.handle.net/10070/673198
23 modelled velocity -1.5 -1.0 -0.5 0.0 0.5 1.0 01 08 15 22 29 05 12 day October 2000 ve lo ci ty (m /s ) ebb tide flood tide Figure 23: Dry Season tide velocities at G8250007 The wet season modelling results for tide gauge G8250007 are given below. (The wet season model is based on 500 cubic metres per second peak flow). Figure 24: Modelled wet season tide height at G8250007 Modelled Elevation -4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0 3.0 36800 36805 36810 36815 36820 36825 36830 36835 36840 Time (days) El ev at io n (m ) elevation