Territory Stories

East Alligator district centre water supply assessment : Kakadu National Park

Details:

Title

East Alligator district centre water supply assessment : Kakadu National Park

Other title

D . Pidsley

Creator

Jamieson, M.; Pidsley, D.; Paiva, Jerome

Collection

E-Publications; E-Books; PublicationNT; Technical Report ; 26/1991

Date

1991-02-26

Description

Made available via the Publications (Legal Deposit) Act 2004 (NT).

Notes

Date:1991

Language

English

Subject

Water-supply -- Northern Territory -- Kakadu National Park; Groundwater -- Northern Territory -- Kakadu National Park; Kakadu National Park (N.T.)

Publisher name

Power and Water Authority

Place of publication

Darwin

Series

Technical Report ; 26/1991

Format

1 v. : ill., maps ; 30 cm.

File type

application/pdf.

Copyright owner

Check within Publication or with content Publisher.

Parent handle

https://hdl.handle.net/10070/229020

Citation address

https://hdl.handle.net/10070/673451

Page content

Technical Report WRD91026 Viewed at 15:07:48 on 29/07/2010 Page 56 of 107. PO\,VER --AND WATER AUTHORITY SASCO House, 8 Cavenagh Street GPO Box 1096, Darwin NT 0801 Telepb.one Enquiries 82 6214 File No, Telex AA85644 Facsimile (089) 41 0703 The Director Australian National Parks and Wildlife Service GPO Box 636 CANBERRA ACT 2601 ATTENTION: BARRY BAKER Dear Sir KAKADU NATIONAL PARK SUPPLY INVESTIGATION EAST ALLIGATOR DISTRICT CENTRE WATER Thank you for yOQr invitation to submit a fee quotation for this consultancy assi<Jnment. We are pleased to respond as follows: INTENDED APPROACH Our intended approach to this assignment is as set out in Attachment A. l\' site visit will be scheduled early in the commission, to inspect the existing water supply infrastl:'Ucture and to discuss the operation of the system with ANPWS oporator. A preliminary report will be prepared containing recommendations as to the ability of the existing system to cope with present and future dema.nd. Following the ANPWS review of this preliminary report, a final report will be prepared, con1:aining recommendations as to work required to allow the system t:o meet present and future projected demands. STAFFING The staff intended to be used on this assignment are as f()llows: Don Pidsley ~Senior Engineer Groundwater) Jerome Paiva (Engineer, Surface Water) Michael Jamieson (Engineer, Groundwater) A brief curriculum vitae for these people is in Attachment B. Ian Smith (Chief Engineer, Hydrology) and Peter Jolly (Pr:Lncipal Engineer, Ground.rater) will also be involved in reviewi,ng the reports. mj2510l:ccs 2 \ '.