East Alligator district centre water supply assessment : Kakadu National Park
D . Pidsley
Jamieson, M.; Pidsley, D.; Paiva, Jerome
E-Publications; E-Books; PublicationNT; Technical Report ; 26/1991
1991-02-26
Made available via the Publications (Legal Deposit) Act 2004 (NT).
Date:1991
English
Water-supply -- Northern Territory -- Kakadu National Park; Groundwater -- Northern Territory -- Kakadu National Park; Kakadu National Park (N.T.)
Power and Water Authority
Darwin
Technical Report ; 26/1991
1 v. : ill., maps ; 30 cm.
application/pdf.
Check within Publication or with content Publisher.
https://hdl.handle.net/10070/229020
https://hdl.handle.net/10070/673451
Technical Report WRD91026 Viewed at 15:07:48 on 29/07/2010 Page 59 of 107. EAST ALLIGATOR DISTRICT .rATER SUPPLY INVESTIGATION 1. LIAISE WITH ANPVlS CONCERNING ENGINEER/ SENIOR ENGINEER (DAYS) AS CONSTRUCTED DRAWINGS ETC 1.5 2. SITE INVESTIGATION OF BORES AND SUPPLY SYSTEM 6 3. ASSESS CAPACITY OF EXISTING SUPPLY SYSTEM 4 4. FAMILIARISATION WITH EAST ALLIGATOR HYDROGEOLOGY AND PREVIOUS GEOPHYSICS AND INVESTIGATIONS CARRIED OUT IN THE AREA 5. ASSESS PREVIOUS BORE PUMP TEST 2.5 DATA 11.5 6. MODELLING OF GROUNDWATER RESOURCE 5 7. PRELIMINARY REPORT PREPARATION 8. REVIEW PRELIMINl,RY REPORT WITH ANPWS 9. PRELIMINARY DESIGN FOR STORAGE A...'qD/OR RETICULA~rION AND/OR NE.q BOREFIELD AS REQUIRED lO.PREPARE QUANTITIES AND ESTIMATES FOR PROPOSED NEW WORKS l1.COMPILE FINAL Rl~PORT 12.REVIEW FINAL REl?ORT 13.REVIEW FINAL REPORT WITH ANPWS 14.FINALISE REPORT TOTAL ENGINEER MAN DAYS 4 0.5 2 1.5 5 0.5 2 46 DAYS ATTACHMENT ,l\, PRINCIPAL OR CHIEF ENGINEER (HOURS) 2 4 TOTAL PRINCIPAL/CHIEF ENGINEER MAN HOURS 6 HOURS mjOOl