Territory Stories

East Alligator district centre water supply assessment : Kakadu National Park

Details:

Title

East Alligator district centre water supply assessment : Kakadu National Park

Other title

D . Pidsley

Creator

Jamieson, M.; Pidsley, D.; Paiva, Jerome

Collection

E-Publications; E-Books; PublicationNT; Technical Report ; 26/1991

Date

1991-02-26

Description

Made available via the Publications (Legal Deposit) Act 2004 (NT).

Notes

Date:1991

Language

English

Subject

Water-supply -- Northern Territory -- Kakadu National Park; Groundwater -- Northern Territory -- Kakadu National Park; Kakadu National Park (N.T.)

Publisher name

Power and Water Authority

Place of publication

Darwin

Series

Technical Report ; 26/1991

Format

1 v. : ill., maps ; 30 cm.

File type

application/pdf.

Copyright owner

Check within Publication or with content Publisher.

Parent handle

https://hdl.handle.net/10070/229020

Citation address

https://hdl.handle.net/10070/673451

Page content

Technical Report WRD91026 Viewed at 15:07:48 on 29/07/2010 Page 91 of 107. ESTIMATE FOR PROPOSED WORKS EAST ALLIGATOR IMMEDIATE WORKS REQUIRED TO PROVIDE NEEDED INFORMATION FOR ASSESSMENT PROVIDE METERS AT DISTRIBUTION POINTS Supply 50mm dia. mechanical water meters 5 meters @ $700 3500 Install and test meters 1 plumber and offsider for 2 days @$40/hr+$30/hr H20 Travel allowance 240 subtotal 4860 EQUIP EXISTING BORES WITH DEVICE SUITABLE FOR MEASUREMENT OF STATIC AND PUMPING WATER LEVELS Materials Pull pump and eqtlip bore wi th measuring column 2 labourers x 0.5 day @$30fhr Travel .allowance lOa 240 60 Total per bore 400 For 4 bores 1600 IMMEDIATE WOF.KS REQUIRED TO ENSURE RELIABILITY OF THE SYSTEl1 CORROSION STUDY On site testing of water source 2 chemhts x 5days @ $50/hr Travel "llowance 2 x 5days @ $60/day Laboratory time 2 chemi"ts x 5 days @ $50/hr Reporting 1 chemi;,t x 2 days @ $SO/hr Computer time Fuel and materials TOTAL 6460 4000 600 4000 800 500 500 TCTAL 10400 EQUIP EXISTING BORES WITH STAINLESS STEEL PUMP COLUMN AND 5.S .. PIPEWORK ABOVE GROUND Pump column $lOO/m " 30m Above ground pip"work Valves and fittings Labour 2 labourers x 2 days @$30/hr Travel allowance 4days @ $60/day Total per bore For 2 bores 3000 1200 4000 960 240 9400 18800