East Alligator district centre water supply assessment : Kakadu National Park
D . Pidsley
Jamieson, M.; Pidsley, D.; Paiva, Jerome
E-Publications; E-Books; PublicationNT; Technical Report ; 26/1991
1991-02-26
Made available via the Publications (Legal Deposit) Act 2004 (NT).
Date:1991
English
Water-supply -- Northern Territory -- Kakadu National Park; Groundwater -- Northern Territory -- Kakadu National Park; Kakadu National Park (N.T.)
Power and Water Authority
Darwin
Technical Report ; 26/1991
1 v. : ill., maps ; 30 cm.
application/pdf.
Check within Publication or with content Publisher.
https://hdl.handle.net/10070/229020
https://hdl.handle.net/10070/673451
Technical Report WRD91026 Viewed at 15:07:48 on 29/07/2010 Page 92 of 107. IMPROVE EXISTING STORAGE Relocate 60kL tank Mobile crane travel to and from site(ex-Darwin) 1200 Crane and operator hire 5hrs @ $99/hr 495 Truck with driver hire Shrs @ $77 /hr 385 Travel allowance for operators 180 Police escort Z police for Zhrs @ $Z6/hr New bolts Concret'" for new footings 20cu.m @ $300/cu.m 2 labourers for 3days @ $30/hr Travel allowance for labourers(2x3 days @ $60/day) subtotal Place liner in 60kL tank Supply liner material Tape to cover intruding bolts Install liner 2 labourers for 1.5 days @ $30/hr Travel allowance for 2x1.Sdays @ $60/day subtotal TOTAL FOR 60kL TANK Place liner in 49kL tank Supply liner material Tape to cover intruding bolts Install liner 104 200 6000 1440 "160 10364 1500 SO 720 180 2450 12814 1200 50 2 labourers for 1. 5 days @ $30/hr 720 Travel allowance for 2xl.5days @ $60/day 180 Place liner in 45kL tank Same as for 49kL tank plus 50:~ for special item Replace galvanis,.d pipework wi th stainless steel 30m pip work x 50mm dia. @ $100/m Labour 2 labourers x 0.5 day @ $30/hr T.A. 1 day @ $60/day REPLACE COPPER PIPEWORK,HOT WATER SERVICES ETC IN HOUSES WIH NON CORROSIVE MATERIALS 9 buildings @ $6000/building subtotal 2150 subtotal subtotal TOTAL TOT.AL 2150 1075 3225 3000 240 60 3300 21489 54000