Territory Stories

East Alligator district centre water supply assessment : Kakadu National Park

Details:

Title

East Alligator district centre water supply assessment : Kakadu National Park

Other title

D . Pidsley

Creator

Jamieson, M.; Pidsley, D.; Paiva, Jerome

Collection

E-Publications; E-Books; PublicationNT; Technical Report ; 26/1991

Date

1991-02-26

Description

Made available via the Publications (Legal Deposit) Act 2004 (NT).

Notes

Date:1991

Language

English

Subject

Water-supply -- Northern Territory -- Kakadu National Park; Groundwater -- Northern Territory -- Kakadu National Park; Kakadu National Park (N.T.)

Publisher name

Power and Water Authority

Place of publication

Darwin

Series

Technical Report ; 26/1991

Format

1 v. : ill., maps ; 30 cm.

File type

application/pdf.

Copyright owner

Check within Publication or with content Publisher.

Parent handle

https://hdl.handle.net/10070/229020

Citation address

https://hdl.handle.net/10070/673451

Page content

Technical Report WRD91026 Viewed at 15:07:48 on 29/07/2010 Page 97 of 107. WORKS TO CATER FOR A 30% GROWTH (Assuming this much water is available) PROVIDE NEW BORES CAPABLE OF PRODUCING 11. 2 L/ sec CONTINUOUS Same as for 10% " 5 (11.2/2.2=5) 5 x $43953 EQUIP NEW BORES Same as for 10% x 5 01.2/2.2=5) 5 x $142710 PROVIDE ADDITIONAL 926kL GROUND LEVEL STORAGE (3 x 304 kL tanks) Corrosion resistant tank materials 3 x $51'000 Ladders,level indicator 3 x $2060 Concrete base Erection 3 x 50 ,~u.m @ $300!cu.m 3 x 3 L.bourers @ $30/hr for 9 days Travel .allowance 3 x 3 labourers for 10 days @ $60/day Transport materials to site REPLACE RETICULATION TO CATER FOR INCREASED DEMAND Clear site of vegetation 5. topsoil & stockpile for restoration $2/line..u m x SllOm Excavate trench to 475mm depth,300mm wide (includes allow~~ce for road crossings) $8/line,al m x 5110m Fence excavation and prepare trench base $4/lineial m x SllOm Supply 100mm N.B. UPVC pipe $107/6m length x 852 lengths Lay,join,bed pip,. 5. compact bedding $lO/lin,.al m x 5110m Provide thrust blocks say 17 blocks @ $50/block Backfill trench $3/line<>1 m x 5110rn Supply & Place pipeline marker posts $75/post x 52 posts Pressure test main $l/line.al m x SllOm Flush/disinfect main $l/line,al m x SHOrn Restoration $3.50/Hneal m x SllOm Supply as constructed information TOTAL subtotal TOTAL COST TO CATER FOR 30% GROWTH 713550 153000 6180 45000 19440 5400 1500 230520 10220 40680 204.40 91164 SllOO e.SO 15330 3900 5110 5110 17885 1000 262989 1427000


Aboriginal and Torres Strait Islander people are advised that this website may contain the names, voices and images of people who have died, as well as other culturally sensitive content. Please be aware that some collection items may use outdated phrases or words which reflect the attitude of the creator at the time, and are now considered offensive.

We use temporary cookies on this site to provide functionality.
By continuing to use this site without changing your settings, you consent to our use of cookies.