Bore Completion Report RN 29012, RN 29013, RN 29090. Stuart Highway and Delmere Road Production Bores.
Moser, A.
E-Publications; ebooks; PublicationNT; E-Books; 31/94D
1994
Made available via the Publications (Legal Deposit) Act 2004 (NT).
Date:1994
English
31/94D
application/pdf.
Check within Publication or with content Publisher.
https://hdl.handle.net/10070/228901
https://hdl.handle.net/10070/673597
Technical Report WRD94031 Viewed at 15:07:29 on 29/07/2010 Page 22 of 34. 1. INTRODUCTION The Department of Transport and ~Alorks {T&W} request,ed in Septernber 1993 that ~la ter Resources Di vision (;~"D) of the Pov;e1..~ and Water Authority conduct an in~lestigation 1,~~ith the aim of drilling 1:WO production bores on the Stuart Highway and one on the Delamere Road to provide water for road maintenance operations. Of the bores on the Stuart HighT.t;ay, T&W requested that one be drilled approximately 40krn south of Nataranka and one 40~"1' . south of Larrimah (subse~~ently named RN29012 and 29013). The Delamere Road bore {RN29090; '.'las to be sited approxirnateli-~ 45k:n north of Top Springs. Location maps are i.:1cluded 'with the bore comple~ion reports. l--. desktop st1.ldy was conducted followed by field reconnaissance during ;,'lhich potential sites y'lere pegged and access checked. Drilling and bere constructi()n \-'Jere unde::ccaken in Decernber, 1993 followed by test pumping in JanuaDJI 1994.