Territory Stories

Bore Completion Report RN 29012, RN 29013, RN 29090. Stuart Highway and Delmere Road Production Bores.

Details:

Title

Bore Completion Report RN 29012, RN 29013, RN 29090. Stuart Highway and Delmere Road Production Bores.

Creator

Moser, A.

Collection

E-Publications; ebooks; PublicationNT; E-Books; 31/94D

Date

1994

Description

Made available via the Publications (Legal Deposit) Act 2004 (NT).

Notes

Date:1994

Language

English

Series

31/94D

File type

application/pdf.

Copyright owner

Check within Publication or with content Publisher.

Parent handle

https://hdl.handle.net/10070/228901

Citation address

https://hdl.handle.net/10070/673597

Page content

Technical Report WRD94031 Viewed at 15:07:29 on 29/07/2010 Page 8 of 34. 4. RECOMMENDATIONS It is recommended that ; - RN 29012 and 29013 be equipped as production bores; a maximum pumpi.ng rate of lOLls be adopted at both bores; if higher extraction rates are Resources Division should be consutted; required, Water absorpcion trenches and septic tanks should not be constructed within 100m of the bore; - further recommendations for bore equipping are included in the test reports (see attachments) .