Ipolera roads bores, bore completion report rn 16879,16880 & 16881.
Paul, R.
E-Publications; ebooks; PublicationNT; E-Books; Report No 78/96
1997
Made available via the Publications (Legal Deposit) Act 2004 (NT).
Date:1997
English
Report No 78/96
application/pdf.
Check within Publication or with content Publisher.
https://hdl.handle.net/10070/228899
https://hdl.handle.net/10070/673599
Technical Report WRD96078 Viewed at 15:07:17 on 29/07/2010 Page 2 of 49. I I I I I I I I I I I I I I I I I I I I SYNOPSIS A production bore, RN 16880, was constructed at Ipolera for Transport and Works as a water supply for maintenance of the Mereenie Loop Road. The bore has a maximum recommended yield for a 35 day continuous pumping period of 3.0 Lis. A standby bore, RN 16881, was also constructed with a maximum recommended yield for a 35 day continuous pumping period of 0.7 Lis. The water is drawn from fractured Ljiltera Member of the Pertnjara Group. Subject Geology Location Keywords Road Maintenance Water Supply Bores Amadeus Basin Ljiltera Member Pertnjara Group Ipo1era Ltalaltuma Aboriginal Land Trust Mereenie Loop Road 1