Batchelor water supply development study 1985.
Keith Lane & Associated Pty Ltd
E-Publications; E-Books; PublicationNT; Report ; 68/1985
1985-12-01
Made available via the Publications (Legal Deposit) Act 2004 (NT).
Date:1985-12
English
Dept. of Mines and Energy
Darwin
Report ; 68/1985
application/pdf.
Check within Publication or with content Publisher.
https://hdl.handle.net/10070/228625
https://hdl.handle.net/10070/673905
Technical Report WRD85068 Viewed at 15:07:30 on 29/07/2010 Page 32 of 58. I I I I I I I I I I I I I I I I I I I I The equipping of the remaining production bore has been included in this section of work. A further new bore will not be required until after the year 2000. 11.4 Maintenance: Because a number of sections of existing AC pipe are approaching the end of their design life, breakages can be expected over the next few years. Where such breakages occur, it is recommended that these sections of pipe be replaced with PVC pipe of the appopriate diameter. It is recommended that regular maintenance checks be made on the system and that the system's performance be monitored. 28