Territory Stories

Alice Springs recreational dam hydrology report project 6

Details:

Title

Alice Springs recreational dam hydrology report project 6

Creator

Jackson, D.; Paige, D.

Collection

E-Publications; E-Books; PublicationNT; Report no. 12/1979

Date

1979-10-01

Notes

Date:1979-10

Language

English

Publisher name

Northern Territory Government

Place of publication

Darwin

Series

Report no. 12/1979

File type

application/pdf

Use

Attribution International 4.0 (CC BY 4.0)

Copyright owner

Northern Territory Government

License

https://creativecommons.org/licenses/by/4.0/

Parent handle

https://hdl.handle.net/10070/228346

Citation address

https://hdl.handle.net/10070/674275

Page content

Technical Report WRD79012 Viewed at 00:02:46 on 18/02/2010 Page 4 of 153. I I I I I I I I I I I I I I I I ( iii) LIST OF FIGURES Figure Following Page 1 2 3 4 5 7 8 9 10 11 12 13 1 2 3. 4 5 Plan of Damsite Locatio!l of Recording stations and Damsite Flow Comparisons on Todd River Capacity - Area Curve of Dam at Old Telegraph Station Flood Frequency curve for GS 006046 Todd Riv'r at Wigley Gorge Flood frequency curve for GS 006009 Todd Rivc~ at Wills Terrace Flond fraquency curve for GS 006126 Todd Rive~ at Hcavitree Gap Flood frequency curve at GS 006046, GS 006009 and Damsite O~~ llour Orlilgraphs at GS 006046, GS 006009 2nd Damsi::e Rainfall/runoff correlation. October to March Rainfall/~unofr correlation. April to September Simulated Dam Behaviour. Spillway level Simulated Dam Behaviour~ Spillway level Simulated Dam Behaviour. Spillway level ~ PAR'l' B ~ Todd River Cross Sections Sediment Transport Flow Relationship Size Distribution of Bed Load Samples at Bed Surface Cross - Sections 6 to 13 Size Distribution of Bed Load Samples at 1m depth Cross - Sections 6 to 13 at at at MO!lthly Suspended Load Flow Rela'tionships 59lm 592.5m 594m 3 6 10 11 13 13 13 16 16 20 20 23 23 23 34 35 36 36 40