Alice Springs recreational dam hydrology report project 6
Jackson, D.; Paige, D.
E-Publications; E-Books; PublicationNT; Report no. 12/1979
1979-10-01
Date:1979-10
English
Northern Territory Government
Darwin
Report no. 12/1979
application/pdf
Attribution International 4.0 (CC BY 4.0)
Northern Territory Government
https://creativecommons.org/licenses/by/4.0/
https://hdl.handle.net/10070/228346
https://hdl.handle.net/10070/674275
Technical Report WRD79012 Viewed at 00:02:46 on 18/02/2010 Page 80 of 153. I I I I I I I I I I I I I I I I I I I I 4. 5 5. 1. 2. (ii) CONTENTS (cont'd) DAM SIMULATION 4.1 General 4.2 Results Using Synthetic Streamflows 4.3 Results Using Historic Streamflows 4.4 Results Using Statistically Generated Streamflows 4.5 Gould Analysis 4.5 Other Results. RESERVOIR ROUTING 5. 1 5.2 General Results FLOODING IN ALICE SPRINGS PART B SEDIMENTATION STUDY INTRODUCTION DATA 2. 1 2.2 2.3 Introduction Suspended Sediment Bed Load Page 22 22 23 23 23 24 25 27 27 27 31 33 34 34 35 36 3. ANALYSIS 37 3.1 3.2 3.3 3.4 3.5 3.6 REFERENCES Introduction Transport Relationships 37 38 DMASS Computer Program 40 Reservoir Sedimentation 41 3.4.1 Trap efficiency Model - Brune's Method 41 3.4.2 Trap efficiency Model - Camp's Method 43 3.4.3 Discussion Sediment Trap Downstream Scour 3.5.1 Moveable Bed Computer Model 3.5.2 Discussion 44 45 47 47 48 49