Alice Springs recreational dam hydrology report project 6
Jackson, D.; Paige, D.
E-Publications; E-Books; PublicationNT; Report no. 12/1979
1979-10-01
Date:1979-10
English
Northern Territory Government
Darwin
Report no. 12/1979
application/pdf
Attribution International 4.0 (CC BY 4.0)
Northern Territory Government
https://creativecommons.org/licenses/by/4.0/
https://hdl.handle.net/10070/228346
https://hdl.handle.net/10070/674275
Technical Report WRD79012 Viewed at 00:02:46 on 18/02/2010 Page 81 of 153. I I I I I I I I I I I I I I I I I I I I l ii i) LIST OF FIGURES Figure Following Page A 1 2 3 4 5 7 8 9 10 11 12 13 1 2 3. 4 5 Plan of Damsite PART A Location of Recording stations and Damsite Flow Comparisons on Todd River Capacity - Area Curve of Dam at Old Telegraph Station Flood Frequency curve for GS 006046 Todd River at Wigley Gorge Flood frequency curve for GS 006009 Todd River at Wills Terrace Flood frequency curve for GS 006126 Todd River at Heavitree Gap Flood frequency curve at GS 006046, GS 006009 and Darnsite One hour Unitgraphs at GS 006046, GS 006009 and Darnsite Rainfall/runoff correlation. October to March Rainfall/runoff correlation. April to september Simulated Dam Behaviour .. Spillway level Simulated Dam Behaviour. Spillway level Simulated Dam Behaviour .. Spillway level ------+ PART B Todd River Cross Sections Sediment Transport Flow Relationship Size Distribution of Bed Load Samples at Bed Surface Cross - Sections 6 to 13 Size Distribution of Bed Load Samples at 1m depth Cross - Sections 6 to 13 at at at Monthly Suspended Load Flow Relationships 59.1m 592.5m 594m 3 6 10 11 13 13 13 16 "16 20 20 23 23 23 34 35 36 36 40