Alice Springs recreational dam hydrology report project 6
Jackson, D.; Paige, D.
E-Publications; E-Books; PublicationNT; Report no. 12/1979
1979-10-01
Date:1979-10
English
Northern Territory Government
Darwin
Report no. 12/1979
application/pdf
Attribution International 4.0 (CC BY 4.0)
Northern Territory Government
https://creativecommons.org/licenses/by/4.0/
https://hdl.handle.net/10070/228346
https://hdl.handle.net/10070/674275
Technical Report WRD79012 Viewed at 00:02:46 on 18/02/2010 Page 84 of 153. I I I I I I I I I I I I I I I I I I I I I INTRODUCTION This report examines the overall hydrological behaviour, including sedimentation of the proposed recreational darn on the Todd River at the Old Telegraph Station. Part A examines dam behaviour, flow reductions downstream of the dam and associated flood attentuation in Alice Springs. Sediment inflow into the dam and downstream scour effects are examined in Part B. The report was prepared under the supervision of: Mr. Andy Macqueen, Senior Engineer, Water Investigations, Alice Springs. Mr. Ralph Ash, ex Mr. Ron Reinhard, & Project Leader Senior Engineer, Hydrographic Section, Darwin senior Engineer, Analysis and Computation, Darwin All Australian Height Datum (AHD) levels in this hydrology report are based on topographic maps produced from aerial photography done in September, 1964.