Territory Stories

Drilling completion report, newhaven excision. Dlh-695

Details:

Title

Drilling completion report, newhaven excision. Dlh-695

Creator

Ellis, D.

Collection

E-Publications; E-Books; PublicationNT; Report ; 29/1989

Date

1989-09-01

Description

Made available via the Publications (Legal Deposit) Act 2004 (NT).

Notes

Date:1989-09

Language

English

Publisher name

Power and Water Authority

Place of publication

Alice Springs

Series

Report ; 29/1989

File type

application/pdf.

Copyright owner

Check within Publication or with content Publisher.

Parent handle

https://hdl.handle.net/10070/228188

Citation address

https://hdl.handle.net/10070/674471

Page content

Technical Report WRD89029 Viewed at 15:07:01 on 29/07/2010 Page 16 of 16. RECOMMENDATIONS FOR FINISHING, OPERATING AND PROTECTING GROUNDWATER BORES Attention to the following points will ensure a long and safe life for the bore supply and help prevent pollution of the groundwater resource. 1. Construct a ccncrete apron around the bore head to prevent suciace flow, seepage and waste from entering the bore. 2. Seal the space between the casing and pump equipment to prevent entry 01 vermin, dirt and pollutants. 3. Maintain pumping equipment in good order to prevent pollution. Prevent spillage of fuel and oil on the ground around the bore. Store fertilizer and other chemicals at least SO m away. 4. Keep stock away from the bore head. Discourage domestic activity at the bore. The first tap on the pipeline should not be less than S m from the bore head. S. Pumping the bore at higher than recommended rates may fork the bore leading to instability or pump maintenance problems. Seek the professional advice of an hydrogeologist or groundwater engineer. '6. If the bore is no longer required, the casing is to be removed or securely capped and the bore backfilled with clayey material. A cement plug may be required in some instances. In addition, please ensure that the BORE IDENTIFICATION TAG is retained securely at all times. The registered bore number is Water Resources Division's only reference to the scientific and engineering data on this bore, and hence important to WRD's further advice to bore owners. BORE LOCATION MAP SEE DRILLING CmlPLETION REPORT NEh'HA VEil EXCISION FOR BORE LOCATION MAP I I I I I I I I I I I I I I I I I I I I


Aboriginal and Torres Strait Islander people are advised that this website may contain the names, voices and images of people who have died, as well as other culturally sensitive content. Please be aware that some collection items may use outdated phrases or words which reflect the attitude of the creator at the time, and are now considered offensive.

We use temporary cookies on this site to provide functionality.
By continuing to use this site without changing your settings, you consent to our use of cookies.