Finniss River (Batchelor) Dam studies vol 1
Summary and Engineering
Sir Alexander Gibbs, and Partners Australia; Willing & Partners Pty Ltd; Environmental Planning Associates
Northern Territory. Department of Transport & Work
E-Publications; E-Books; PublicationNT; Finniss River DAM studies; Report; 43/1981
1981-02-28
Batchelor; Finniss River
The findings of the report indicate that the concept of a further storage supply to Darwin based on a dam on the Finniss River at Batchelor would be feasible and that the optimum development programme for the Batchelor Scheme would involve, in sequence, the following works : (i) construction of a pumping station at Hanna's Pool to divert the unregulated flows of the Finniss River through a steel rising main to the Darwin River catchment. (ii) construction of Batchelor Dam to F.S.L. 68 m A.H.D. (iii) construction of a concrete lined channel to transfer water between Batchelor and Darwin River Reservoirs.
Dept. of Transport & Works in association with Sir Alexander Gibb & Partners Aust., Willing & Partners, Environmental Planning Associates.
Summary and recommendations -- 1. Introduction -- 2. Yield Studies -- 3. Alternatives project layouts and costs -- 4. Economic studies -- 5. Project design and estimates -- APPENDICES : APPENDIX A Topographic Survey & Mapping -- APPENDIX B Geological Studies -- APPENDIX C Hydrological Investigations -- APPENDIX D Soils Laboratory Test Results -- APPENDIX E Batchelor Dam Design -- APPENDIX F Costing Data for Pipelines and Channels -- APPENDIX G Results of Economic Analyses for Alternative Discount Rates
English
Dams; Environmental impact statements; Water resources development Environmental aspects
Northern Territory Government
Darwin
Finniss River DAM studies; Report; 43/1981
Final report volume 1 Summary and Engineering
1 volume (various paging) : illustrations and maps ; 30 cm.
application/pdf
Attribution International 4.0 (CC BY 4.0)
Northern Territory Government
https://creativecommons.org/licenses/by/4.0/
https://hdl.handle.net/10070/674135 [Finniss River (Batchelor) Dam studies vol 2]
https://hdl.handle.net/10070/843475
https://hdl.handle.net/10070/843476
400 300 100 400 'O ---l: Cl 300 ...J UJ ->U.J ~ 200 l/) u.J z co 100 ~ a u 400 300 200 BATCH= LOR F.S.L. 71 0 (C~PACITY 270 MCM) 3 X L TA F / 2 70 MC M .-~..-,t----+I ---+~~~b~~~ ./_ l3 XL TA F/ 2 O MCM _. ~~::::=:---t----f~1X~Lr,1~ArF l~7~'V ~O ~M~C !LM- .....J /1,11""'"" 1X LT AF/ 2 l 0MCM .. BATCHELOR F.S.L . 680(CAIPA[ITY 177 MCM) 3XLTAF/ 177 MCM 4 1 X LT AF/ 100 H CM BAT C r E LOR F. S. L 6 4 0 ( CJ PAC I TY 7 9 M C M ) 1 X LT AF / 79 MC M* 1 X LTAF / 60 MCM' .. NOTE : REFERS TO WAR RA I -B,~TC HE LOR [ IVERS ION C~PACITY (LTAF = 57 m3Js)ANO S '"DRAGE VO ... UME AT B, .. TCHELOR 100 BELOW WHICH FLOW IS DIVER T~D FROM \lARRAI. ,____ __ -1,_ ___ .J...-__ _.J.. ___ ..i,__ __ _.J.. ___ .J...-__ _J,.. _____ .. 1 2 3 4 5 6 7 8 0 TRANSFER CAPAC ITY ( BATCHELOR -DARWIN RIVER) IN CUMECS COMB INED SAFE YIELD - DARW IN AND BATCHELOR RESERVOIRS WITH DIVERSION WEIR AT WARRAI FIGURE 2.8
Aboriginal and Torres Strait Islander people are advised that this website may contain the names, voices and images of people who have died, as well as other culturally sensitive content. Please be aware that some collection items may use outdated phrases or words which reflect the attitude of the creator at the time, and are now considered offensive.
We use temporary cookies on this site to provide functionality. |
You are welcome to provide further information or feedback about this item by emailing TerritoryStories@nt.gov.au